Fit-out of a medical facility

Gyncentrum


  • 500 sqm

  • 5 months


As part of the work for the tenants of Centrum Orląt - building refurbished by Tetris - we were asked to fit-out a fertility treatment clinic.

The fit-out of a medical facility presented slightly different challenges to the contractor than office spaces. One of these was the equipment, which had to be properly soundproofed. Specific requirements also applied to the finishing materials, which had to be suitable for cleaning with disinfectants, etc.

We'd love to hear
from you

Get in Touch